Skip to the content
INSTALLATION
- AC Mitigation Installation
- Impressed Current Groundbed
- Deep Groundbed
- Conventional/Distributive
- Linear Anode
- Galvanic CP System
- Bonds
- Tank CP Systems
- New Tank Bottom Installations
- Existing Tank Bottom Installations
- Test Stations
- Remote Monitoring Unit Installations
REGULATORY SURVEYS
- Close Interval Survey (CIS)
- Pipeline Current Mapper (PCM)
- Direct Current Voltage Gradient (DCVG)
- Alternating Current Voltage Gradient (ACVG)
- Direct Examination (DE)
- Annual Survey
- Bi-Monthly Rectifier Checks
- Critical Bond
- Cell to Cell Survey
- Leak Detection
- HCA Survey
- Coating Inspections
- Offshore Platform Visual Assessment – BSEE
- Federal and State Audit Support
OPERATIONS & MAINTENANCE
- Shorted Casing Testing
- AGM Tracking
- Coating Repair
- Non-Destructive Testing (NDT)
- Hydro Excavation
- Test Point Installation
- Right of Way Signs
- Test Station Repair
- TX 811 One Call Response
- Interference and Troubleshooting
- Depth of Cover (DOC)
- GIS Survey – Sub Centimeter GPS Notation
- Isolation Testing
- Due Diligence
DESIGN & ENGINEERING
- AC Mitigation Design
- Cathodic Protection Design/Testing
- Current Demand/Requirement
- Tank CP Design